What is the Timeframe from Ordering to delivery: to USA or Canada

    Shipment from factory is typically within 21 working days or receipt of deposit

    Estimate 29 days to West-coast (N Ameica) port, then your on-shipment time from west coast. Other countries will vary.

    Orders to different parts of the world will vary.

What is included in a turbine kit?

    Everything you need to put the Turbine into production including foundation rebar, and except: Labour, delivery from port to site, concrete etc. 

     

What is not included in a turbine kit?

    You will need to built a foundation, install interconnection, decide if you are on grid or off grid; the latter will need things such as storage batteries. Installation: You will also need a hydraulic erection package if you don’t want to use a crane.

     

Is there any training to install and operate the turbines safely?

    Currently training will only be available on a one to one basis.

    Eventually we hope to run workshops to build and operate the Turbines, as well as to optimize their performance. 

     